HKEX · 1772.HK

Ganfeng Lithium

4 producing1 ramping1 development

≈ 128 kt LCE/yr attributable

As of 25 Oct 2026

Share price

SZSE:002460

Prices are delayed (end of day for Shanghai and Shenzhen). Hong Kong listings show the company's mainland A-share where it has one.

Capacity by value-chain step

Attributable kt LCE/yr, by stage · As of 25 Oct 2026
Upstream: mines and brines128 kt LCE/yr
Producing 77Ramping 17Development 34
Downstream: refineries—

Net seller of lithium units (mines exceed own refining)

Not quantified yet: Xinyu conversion (no capacity on file)

Position on the cost curve

Landed US$/t LCE, same assumptions as the cost curve · As of 24 Oct 2026
Hombre Muerto West (HMW): $3,963/t LCEQarhan Salt Lake: $4,292/t LCE (implied)Cauchari-Olaroz: $5,897/t LCEYichun lepidolite belt: $6,012/t LCE (implied)Greenbushes: $6,201/t LCEPilgangoora: $7,330/t LCEMibra: $7,416/t LCEWodgina: $7,489/t LCEFinniss: $7,913/t LCEZabuye Salt Lake: $8,265/t LCE (implied)Mt Marion: $9,166/t LCEGrota do Cirilo: $9,503/t LCEKathleen Valley: $10,203/t LCENorth American Lithium: $11,166/t LCE$11,1660

Stake-weighted landed cost $7,405/t LCE · covers 35 of 94 kt LCE/yr attributable producing capacity · cheaper than about 40% of costed supply

Grey: every producing mine with a reported cost (width = capacity). Highlighted: this company's mines. The dashed line is the stake- and capacity-weighted average. Lighter dashed bars are implied costs (no reported unit cost).

Lithium assets on Li3atlas

6 assets · As of 25 Oct 2026
AssetCountryStageOwnershipCapacityAttrib. kt LCELanded US$/t LCEVerified
Upstream: mines and brines · subtotal 128 kt LCE/yr attributable (77 producing, 17 ramping, 34 development)
Cauchari-OlarozArgentinaProducing46.7%H1 2026 ~19 kt Li2CO3; FY26 guidance 35–40 kt; design ~40 kt19≈$5,89724 Oct 2026
GoulaminaMaliProducing65%Phase I 506 ktpa SC nameplate; H1 2026 233.8 kt SC produced (near full utilisation)42—24 Oct 2026
Mt MarionAustraliaProducing50%Q1 FY27 sales 58 kt SC6 (attrib.); FY27 guidance 200–240 kt SC616≈$9,16624 Oct 2026
MarianaArgentinaRamping100%Phase 1 20 ktpa LiCl; formal production since 12 Feb 2025; first export Feb 202617—25 Oct 2026
Pozuelos-Pastos Grandes (PPG)ArgentinaDevelopment67%Scoping Study: Phase 1 50 ktpa LCE (Pozuelos), rising to 150 ktpa over three stages; hybrid solar-evaporation + SX DLE; Phase 1 EIA approved Nov 2025; RIGI applied Q1 202634—Pending
Downstream: conversion and refineries
Xinyu conversionChinaProducing100%Xinyu nameplate: 10,000-ton Lithium Salt plant 81 kt LiOH, 12 kt Li₂CO₃, 12 kt LiCl, 2 kt butyl-Li; Xinyu Ganfeng 30 kt HP Li₂CO₃, 25 kt LiF (2026)——24 Oct 2026

Headline counts mines and brines only. Refineries are listed with their attributable conversion capacity, which is shown under Downstream above and not added to the headline, so lithium is not counted twice. Cell plants are demand, not supply. Landed cost uses the assumptions set on the cost curve.

Catalyst calendar

Dated milestones with their source · As of 25 Oct 2026

Upcoming

Recently done

Report an error