PPG JV (Millennial Lithium B.V.): Ganfeng 67%, Lithium Argentina 33% (definitive agreements 24 Aug 2026; Ganfeng operator). Before JV closing: Pozuelos 100% Ganfeng; Pastos Grandes SA 85% LAR / 15% Ga
Scoping Study: Phase 1 50 ktpa LCE (Pozuelos), rising to 150 ktpa over three stages; hybrid solar-evaporation + SX DLE; Phase 1 EIA approved Nov 2025; RIGI applied Q1 2026 ≈ 50 kt LCE/yr (planned)
Location
-24.70°, -66.82°
Salta Province. Pin is the Pozuelos salar centre (Phase 1 site) as stated in the 20-F; plant and pond coordinates are not published, so the pin is not located to within 1 km of facilities. Pastos Grandes salar centre 24°34′S, 66°42′W (20-F p. 56). JV closing was expected end Sep 2026 (material chang
Ownership structure
Effective economic interest of listed owners · As of 25 Oct 2026