Capacity by value-chain step

Attributable kt LCE/yr, by stage · As of 24 Oct 2026
Upstream: mines and brines111 kt LCE/yr
Ramping 111
Downstream: refineries—

Net seller of lithium units (mines exceed own refining)

Lithium assets on Li3atlas

3 assets · As of 24 Oct 2026
AssetCountryStageOwnershipCapacityAttrib. kt LCELanded US$/t LCEVerified
Upstream: mines and brines · subtotal 111 kt LCE/yr attributable
Lakkor TsoChinaRamping63%Phase 1 20 ktpa lithium salt in operation; Phase 2 +40 ktpa targeted end-2027; 2025 production 12,000 t LCE (project page); H1 2026 9,065 t LCE (H1 Interim)13—24 Oct 2026
Manono (Manono Lithium)DR CongoRamping54.9%H1 2026 production 5,379 t LCE (2,953 t attributable at 54.9%); DMS plant producing since May 202669—Pending
Tres Quebradas (3Q)ArgentinaRamping100%Phase 1 commissioned (2025 output 5.8 kt LCE; H1 2026 9.2 kt LCE); upgrade to 30 ktpa Li2CO3 planned; Phase 2 +40 ktpa under RIGI30—Pending

Headline counts mines and brines only. Refineries are listed with their attributable conversion capacity, which is shown under Downstream above and not added to the headline, so lithium is not counted twice. Cell plants are demand, not supply. Landed cost uses the assumptions set on the cost curve.