Mine / resource · DR Congo
PE 15775, Tanganyika Province. DMS plant started production May 2026, about a month early; smelting plant targeted end-2026. Location = pit/plant area NE of Manono town from satellite imagery (filings give no coordinates), may be off by up to ~1 km. Corrects #93.
| Listed owner | Stake | kt SC/yr | kt LCE/yr |
|---|---|---|---|
| Zijin Mining | 54.9% | ≈514 | ≈69 |
Structure: Manono Lithium SAS: Zijin Mining (via Jinxiang Lithium) 54.9%, COMINIERE 35.1%, DRC state 10%. AVZ Minerals disputes the ownership in arbitration.. 45.1% is held by unlisted or untracked owners.
| H1 2026 | |
|---|---|
| Production (kt LCE) | 5.4 |
| Date | Field | Change | Source |
|---|---|---|---|
| 25 Oct 2026 | production_plan | 2026: 30 kt LCE · Company 2026 production plan (Annual Report 2025); not a DFS/PFS schedule (as of 2025-12-31) | Zijin Mining Group Co., Ltd. Annual Report 2025 (HKEX) |
| 24 Oct 2026 | Quarterly figures | H1 2026 · production 5.379 kt LCE | Zijin Mining Group Co., Ltd. Interim Report 2026 (HKEX, 25 Sep 2026) |
| 24 Oct 2026 | Capacity | Phase 1 5 Mtpa ore, ~1 Mtpa spodumene concentrate (design); DMS producing since May 2026, flotation feed commissioning Jul 2026; 100.8 ktpa crude lithium sulphate smelter due end-2026 → H1 2026 production 5,379 t LCE (2,953 t attributable at 54.9%); DMS plant producing since May 2026 | Zijin Mining Group Co., Ltd. Interim Report 2026 (HKEX, 25 Sep 2026) |
| 24 Oct 2026 | Milestone | Q4 2026 · Smelting plant completion and start of production Expansion Expected | Zijin Mining Group Co., Ltd. Interim Report 2026 (HKEX, 25 Sep 2026) |
| 24 Oct 2026 | Notes | PE 15775, Tanganyika Province. Production start and flotation commissioning per Zijin's Q3 2026 report. Location = new pit/plant area NE of Manono town, from satellite imagery (Zijin gives no coordinates); may be off by up to ~1 km. 1 Mt concentrate of unstated grade converted at 8.0 t per t LCE. → PE 15775, Tanganyika Province. DMS plant started production May 2026, about a month early; smelting plant targeted end-2026. Location = pit/plant area NE of Manono town from satellite imagery (filings give no coordinates), may be off by up to ~1 km. Corrects #93. | Zijin Mining Group Co., Ltd. Interim Report 2026 (HKEX, 25 Sep 2026) |
| 24 Oct 2026 | Notes | Added to Li3atlas: Manono (Manono Lithium) | Zijin Mining: Manono Northeast Lithium Project page |