ASX · ELV.AX

Elevra Lithium

1 producing2 development

≈ 81 kt LCE/yr attributable

As of 24 Oct 2026

Share price

ASX:ELV

Prices are delayed (end of day for Shanghai and Shenzhen). Hong Kong listings show the company's mainland A-share where it has one.

Capacity by value-chain step

Attributable kt LCE/yr, by stage · As of 24 Oct 2026
Upstream: mines and brines81 kt LCE/yr
Producing 25Development 56
Downstream: refineries—

Net seller of lithium units (mines exceed own refining)

Position on the cost curve

Landed US$/t LCE, same assumptions as the cost curve · As of 24 Oct 2026
Hombre Muerto West (HMW): $3,963/t LCEQarhan Salt Lake: $4,292/t LCE (implied)Cauchari-Olaroz: $5,897/t LCEYichun lepidolite belt: $6,012/t LCE (implied)Greenbushes: $6,201/t LCEPilgangoora: $7,330/t LCEMibra: $7,416/t LCEWodgina: $7,489/t LCEFinniss: $7,913/t LCEZabuye Salt Lake: $8,265/t LCE (implied)Mt Marion: $9,166/t LCEGrota do Cirilo: $9,503/t LCEKathleen Valley: $10,203/t LCENorth American Lithium: $11,166/t LCE$11,1660

Stake-weighted landed cost $11,166/t LCE · covers 25 of 25 kt LCE/yr attributable producing capacity · cheaper than about 0% of costed supply

Grey: every producing mine with a reported cost (width = capacity). Highlighted: this company's mines. The dashed line is the stake- and capacity-weighted average. Lighter dashed bars are implied costs (no reported unit cost).

Lithium assets on Li3atlas

3 assets · As of 24 Oct 2026
AssetCountryStageOwnershipCapacityAttrib. kt LCELanded US$/t LCEVerified
Upstream: mines and brines · subtotal 81 kt LCE/yr attributable (25 producing, 56 development)
North American LithiumCanadaProducing100%FY26 198 kt SC (~5.0% Li2O); FY27 guidance 198–210 kt SC5.225≈$11,16624 Oct 2026
Carolina LithiumUnited StatesDevelopment100%Study case ~242 ktpa SC6 over 11-yr reserve life plus planned 30 ktpa LiOH plant (to be built by a downstream partner); permitting, no FID32—Pending
MoblanCanadaDevelopment60%2024 DFS 300 ktpa SC6 (21-yr LOM); DFS update under way; Reserve 48.1 Mt @ 1.31% Li2O (Jun 2025)24—Pending

Headline counts mines and brines only. Refineries are listed with their attributable conversion capacity, which is shown under Downstream above and not added to the headline, so lithium is not counted twice. Cell plants are demand, not supply. Landed cost uses the assumptions set on the cost curve.

Catalyst calendar

Dated milestones with their source · As of 24 Oct 2026

Upcoming

Recently done

Report an error