KRX · 005490.KS

POSCO Holdings

2 ramping

≈ 45 kt LCE/yr attributable

As of 25 Oct 2026

Capacity by value-chain step

Attributable kt LCE/yr, by stage · As of 25 Oct 2026
Upstream: mines and brines45 kt LCE/yr
Ramping 45
Downstream: refineries31 kt LCE/yr
Ramping 31

Self-sufficiency (upstream ÷ downstream) 144% · Net seller of lithium units (mines exceed own refining)

Lithium assets on Li3atlas

2 assets · As of 25 Oct 2026
AssetCountryStageOwnershipCapacityAttrib. kt LCELanded US$/t LCEVerified
Upstream: mines and brines · subtotal 45 kt LCE/yr attributable
Sal de Oro (POSCO Argentina)ArgentinaRamping100%Plant I: 25 ktpa LiOH (General Güemes, Salta) ramping; Plant II: ~23 ktpa Li2CO3 at the salar, opened Oct 2026, ramp-up in 2027; MoU for stages III-IV towards 100 ktpa45—Pending
Downstream: conversion and refineries · subtotal 31 kt LCE/yr attributable
POSCO Pilbara Lithium Solution (Gwangyang)South KoreaRamping82%43 ktpa LHM nameplate (two 21.5 ktpa trains); Jun Q 2026 batch ops 882t Train 1 + 2,679t Train 2; sold 3,590t LHM31—25 Oct 2026

Headline counts mines and brines only. Refineries are listed with their attributable conversion capacity, which is shown under Downstream above and not added to the headline, so lithium is not counted twice. Cell plants are demand, not supply. Landed cost uses the assumptions set on the cost curve.